Nearly every delay we see on site comes down to the same handful of things: a room that is not clear, or a subfloor that is not ready. Half an hour of preparation is usually the difference between a job finished in one visit and a second trip.
Furniture, curtains, rugs and anything breakable out of the room, and built-in cupboards emptied if the floor runs under them. If you need a hand with heavy items, tell us when we confirm the date so we can plan for it rather than discover it on the morning.
Lift the old covering if that was the agreement, or leave it if removal and disposal are on your quote. Either way the subfloor needs to be dry, clean and reachable when we arrive.
A floor laid on a damp subfloor will lift or cup later, so new screed, a recent leak or a damp patch has to be dealt with before we lay.
Our own self-levelling screed is only 2 to 3 mm thick and dries overnight, so we can fit the following day. A thick builders screed is a different matter and needs weeks — if your build is on a deadline, tell us early.
Laminate and engineered wood are delivered into the room a day or two before laying, so the boards settle to the temperature and humidity of the house. Leave the packs flat and in the room they are going into.
The team needs a working plug, access to water and somewhere to park near the door. On an estate or in a complex, arrange access for the vehicle and the crew in advance.
Cutting is dusty and loud. Plan to be out of that room for the day, and if you work from home set up somewhere else in the house.
Keep them clear of the work area. There are blades, adhesives and offcuts on the floor all day.
Small calls come up — which way the boards run, where a trim lands. It helps if whoever decides is reachable on the phone.
If something does not look right in the days after, phone us rather than live with it. It is easier for everyone to fix while the job is fresh. See our full cleaning and care answers →